7-4-11-ustanovka-korobki-differenciala.html
7.4.11. Installation of a box of differentialCheck of a preliminary tightness of bearings of a box of differential by adaptation A.95688/R
1 – the fastening screw;
2 – key А.55085;
3 – a conducted gear wheel;
4 – an adjusting nut;
5 – the intermediate lever; |
6 – the fastening screw;
7 – an indicator arm;
8 – the screw of a tightening of an arm;
9 – the indicator for check of a preliminary tightness of bearings of a box of differential |
PERFORMANCE ORDER |
1. Establish in картер, preliminary collected box of differential, together with external rings of bearings. |
2. Establish two adjusting nuts 4 so that they adjoined to rings of bearings. |
3. Establish covers of bearings and tighten fastening bolts динамометрическим a key. |
|
|
|