|
3-12-6-natyazhitel.html
3.12.6. НатяжительSpecification for spring check натяжителя
Dismantling and assemblage
| PERFORMANCE ORDER |
| 1. For dismantling натяжителя chains remove колпачковую fixing nut 1 (fig. the Cut натяжителя chains), a tightening cracker 9 and a spring ring 4 see, then take out плунжер 7, a spring 5 and a core 3 together with a spring 8 and a washer 6. |
| 2. Assemblage make upside-down. |
|
The control
| PERFORMANCE ORDER |
| 1. Check up, whether is not present on crackers 9 and on a core 3 задиров, and on interfaced surfaces of a boot and плунжера натяжителя a chain deep рисок. The damaged details replace. |
| 2. Elasticity of a spring натяжителя should be in the limits specified in fig. the Specification for check of a spring натяжителя; at smaller elasticity a spring replace. |
| 3. Check up, whether there is no raised deterioration on a boot and успокоителе; if it is necessary, replace them. |
|
|
|